What opens and when
From 14 December a bus rapid transit line starts working along Zheltoksan street. The rebuilt section is 4.6 kilometres long. It joins the existing BRT line on Timiryazev street with the section under construction on Rayymbek avenue and forms a single express corridor running south to north.
Which buses will use the line
In the first stage buses of route 92 will start running along the new layout.
Where the bus lanes run
The dedicated lanes sit at the edges of the carriageway: on the right northbound and on the left southbound. This cuts the number of conflicts on the road and raises the overall speed of transport.
What changes for drivers
Parking along the kerbs of Zheltoksan street is banned outright. Compliance with traffic rules is enforced by photo and video systems.
What else was rebuilt on the street
The project replaced the road surface, built modern stop pavilions, installed new lighting and laid out pedestrian areas.
Route maps and stops are on the routes page.