How the company lightens its load on the city: electric transport, closed-loop water at the washes, cables moved underground, and reuse of the materials that come down.

Electric transport

The trolleybus is the city's oldest electric transport, and the company maintains its contact network. At depot No. 5 electric buses work alongside gas buses.

Electric transport
  • Electric buses produce zero harmful emissions
  • Electric buses are almost silent and recover braking energy
  • Five charging stations of 160 kW at depot No. 5
  • Trolleybuses have run in Almaty since 1944

Closed-loop water at the washes

At three sites the wash runs on a closed loop: the water is filtered and used again. At the other depots buses are washed on site, without leaving the grounds.

Closed-loop water at the washes
  • Depot No. 2: Christ ECO BUS equipment (Germany), two lanes, with filtration and recirculation
  • Depot No. 5: a two-gantry wash with filtration, recirculation and closed-loop water supply
  • Trolleybus depot: Raisens equipment (China), single lane, closed-loop water supply

Fewer wires over the city

The point of the Clean Sky project is to cut the visual noise of the street. The cables go underground, and a freshly laid pavement is not cut open again next season for the next line.

Fewer wires over the city
A design solution, not a photograph of completed work
  • The failing 600 V feeder cables move underground
  • Energy efficient LED luminaires on the same poles
  • One pole carries both the overhead line and the lamp

Materials are put back to use

At the square by Almaty-1 station the dismantled equipment is put back to use.

Materials are put back to use
A design solution, not a photograph of completed work
  • The poles, wires and suspension hardware that come down are not scrapped
  • The equipment is reinstalled on three sections of Momyshuly Street